Create an order export job
Creates an asynchronous job to export orders to CSV.gz file. Returns a job_id that can be used to check status. Download link will be sent via email when ready.
Get Plans GET
API to fetch list of plans based on a set of filters ### Planning failure reasons When an order is left unplanned by automated planning, `planning_failure_reason` may contain one of these values: - `No Worker was available for this plan.` - `No Worker schedule overlaps with this order's time window.` - `This order is outside the available Worker working hours.` - `Worker location is unavailable, so travel time could not be evaluated.` - `Worker start location is unavailable for the configured route start setting.` - `No Worker supports the required product type for this order.` - `Route was being modified concurrently and this order needs to be re-planned.` - `The optimizer dropped this order to satisfy planning constraints for the overall plan.` - `The optimizer could not find a feasible plan for the provided constraints.` - `Travel time calculation failed for this planning attempt.` - `Ops group configuration is incomplete for automated planning.` - `Assigning this order would exceed route or Worker capacity.` - `No Worker can reach this order before scheduled_at.` - `Assigning this order would delay an already planned downstream order.` - `Assigning this order would exceed the Worker's shift end time.` - `Automated planning could not assign this order with the provided constraints.`
Get Routes GET
Retrieve routes based on the filter parameters provided ### Planning failure reasons When an order is left unplanned by automated planning, `planning_failure_reason` may contain one of these values: - `No Worker was available for this plan.` - `No Worker schedule overlaps with this order's time window.` - `This order is outside the available Worker working hours.` - `Worker location is unavailable, so travel time could not be evaluated.` - `Worker start location is unavailable for the configured route start setting.` - `No Worker supports the required product type for this order.` - `Route was being modified concurrently and this order needs to be re-planned.` - `The optimizer dropped this order to satisfy planning constraints for the overall plan.` - `The optimizer could not find a feasible plan for the provided constraints.` - `Travel time calculation failed for this planning attempt.` - `Ops group configuration is incomplete for automated planning.` - `Assigning this order would exceed route or Worker capacity.` - `No Worker can reach this order before scheduled_at.` - `Assigning this order would delay an already planned downstream order.` - `Assigning this order would exceed the Worker's shift end time.` - `Automated planning could not assign this order with the provided constraints.`